Aggregate Volume – For 1:2:4 Concrete Mixes

Quick answer

Aggregate for concrete orders: per m³ of 1:2:4 take 0.44 m³ sand + 0.88 m³ gravel (× 1.52 dry factor), plus moisture-corrected weights.

Figures are estimates from this calculator’s standard formula — adjust the inputs in the tool below for your exact number.

How does the aggregate calculator work?

Sand = V × 1.52 × 2/7; Gravel = V × 1.52 × 4/7

This tool applies the formula Sand = V × 1.52 × 2/7; Gravel = V × 1.52 × 4/7 directly to the measurements you enter, so the result is an exact quantity rather than a rough guess. Because aggregate is priced and delivered per unit - cubic meters, square meters, bags or tonnes - a small measurement error multiplies across the entire order, which is why the calculation is worth doing properly. Worked example: For 6 m³ of 1:2:4: sand 6 × 1.52 × 2/7 = 2.6 m³; gravel 5.2 m³ - 4.2 t + 8.6 t delivered. One note from practice: Add a 5-10% waste margin to aggregate before ordering. Enter the concrete volume and mix ratio, check the totals, then round up to the nearest whole bag, sheet or roll before you place the order.

  1. 1

    Take dimensions

    Note the concrete volume and mix ratio for the area you are covering or filling.

  2. 2

    Run the calculation

    The calculator applies Sand = V × 1.52 × 2/7; Gravel = V × 1.52 × 4/7 the moment you type.

  3. 3

    Check the breakdown

    Compare base quantity and waste-adjusted totals side by side.

  4. 4

    Plan the purchase

    Use the final figure to price and schedule the delivery.

Use Cases

Gravel and sand supply

Ton and m³ figures for aggregate deliveries.

Landscape leveling

Topsoil and mulch depths for aggregate finished grades.

Cut and fill balance

Balance aggregate cut against fill to minimize hauling.

Common Mistakes

  • Compacting thick lifts

  • Forgetting stripping topsoil

  • Under-ordering by truck

FAQs

Sand and gravel for 1 m³ of 1:2:4?

0.44 m³ sand and 0.88 m³ gravel after the 1.52 dry factor - about 0.7 t and 1.45 t.

Aggregate for a 10 m³ slab at 1:2:4?

4.4 m³ sand (7.1 t) and 8.8 m³ gravel (14.5 t) - one 10 m³ truck each.

Coarse aggregate size for slabs?

20 mm max for reinforced slabs, 40 mm for mass concrete - oversize stone jams between bars.

Moisture correction on aggregate?

Wet sand carries 5-8% surface water: cut batch water 1 L per 15 kg of wet sand.