Baggage Delay & Lost Bag Calculator — Claim What the Airline Owes You
A bag delayed 2 days on a domestic flight gets no automatic payout — the realistic claim is $105 of interim expenses (day-one kit $45 + one extra day × $60) in a $70-$140 band, paid only against receipts after a PIR report within 4 hours at the airport and a written claim within 21 days. If it's declared lost after 21 days, the DOT's $3,960-per-passenger cap opens — but carriers pay depreciated value: about $420 on a $600 declaration (70%), plus $105 interim — $525 total. And the claim nobody files: your card's travel protection — $100-$500 per day, so $600 for these two days at the $300 midpoint, provided the fare was paid on that card. Exclusions stand: cash never covered, electronics often excluded, jewelry capped at $500-$1,000 — and damage is a written notice within 7 days settling near $300.
Baggage Delay & Lost Bag Calculator — Claim What the Airline Owes You
Inputs
Delayed 24h+: No automatic payout — reasonable interim expenses against receipts.
Domestic (US): DOT regime: $3,960-per-passenger liability cap (2024-updated, inflation-indexed). PIR within 4 hours.
Essentials kit: toiletries, a shirt, underwear, a charger — day one $45, $60 per extra day
Legal cap $3,960 — but the carrier pays depreciated value (60-80%)
Cash, currency and documents are never covered — carry them on, always. Electronics are often excluded, jewelry capped at $750
Credit-card travel protection: If you paid the fare with a card carrying baggage protection, it often pays $100-500/day toward delay essentials or a fixed lost-bag benefit — frequently faster and better than the airline. File it in parallel, not instead: it requires the PIR report, proof the fare hit that card, and receipts. The claim most travelers never use.
Your realistic claim is $105 (band $70-$140) of interim essentials, paid strictly against receipts. File the PIR at the airport within 4 hours, then submit the written claim within 21 days with an itemized list of every purchase.
Submit with it: PIR report number · baggage tags · boarding pass · itemized receipts · photos of contents.
Delayed bag: claim $50-150 of essentials with receipts. Lost bag: up to $3,960 domestic — but expect depreciated value, and file the credit-card travel protection claim most travelers never use.
If you paid the fare with a card carrying baggage protection, it often pays $100-500/day toward delay essentials or a fixed lost-bag benefit — frequently faster and better than the airline. File it in parallel, not instead: it requires the PIR report, proof the fare hit that card, and receipts. The claim most travelers never use.
Deadlines: file the PIR at the airport within 4 hours of a domestic delay, written notice of damage within 7 days, and a written delayed-bag claim within 21 days. The bag is typically declared lost after 21 days. Cash, currency and documents are never covered — carry them on, always.
Bands are 2026 planning ranges from published rules (DOT cap, Montreal Convention, carrier policies) — not legal advice or live offers, and your carrier's policy governs: read it before you file.
We may earn a commission.
Results
Embed This Calculator
Share this tool with your audience. 100% free and fully responsive.
How the baggage delay & lost bag calculator works
Enter your trip details to get travel figures based on current, -specific numbers.
- 1
Step 1
Pick the scenario (delayed 24h+ / lost / damaged) and trip type (domestic / international) — the legal frame switches: interim expenses, the DOT's $3,960 domestic cap, or the Montreal Convention at about $2,000 internationally.
- 2
Step 2
Move the days-without-bag slider (1-7) and your declared bag-plus-contents value ($100-2,500), and flag electronics and jewelry if they were inside — exclusions and caps apply automatically to the claimable figure.
- 3
Step 3
Read the realistic computed claim with its low-high band, exactly what to submit (the PIR report, receipts, the written notice and its deadline), and what your credit-card travel protection adds if you paid the fare with the card.
Use Cases
Plan travel for
Get exact, current figures for travel in instead of vague averages.
Compare destinations
Weigh against other cities before booking flights or hotels.
Budget before you book
Know the expected spend in so surprises don't derail the trip.
Tips
- 1
Prices for move with season — re-check near your travel dates.
- 2
Use local currency figures for ; card rates add conversion fees.
- 3
Book ahead when visiting in peak season.
Common Mistakes
Budgeting with peak-season averages.
Ignoring visa lead times before booking.
FAQs
What do airlines actually pay for delayed bags?
The $3,960 cap — will I actually get it?
Which reporting deadlines can kill my claim?
What do baggage compensation rules NOT cover?
Why are receipts everything in these claims?
How does credit-card travel protection work — why does nobody use it?
What are the Montreal Convention basics for international flights?
How do I prevent the disaster — and who carries "the first 24 hours"?
Related tools
Pick another tool to continue your calculation.