Asphalt tonnage: tons = area × depth × 2.3 t/m³ - 0.023 t per m² per cm - plus 5% compaction waste and 2-5 cm lifts for driveways.

Figures are estimates from this calculator’s standard formula — adjust the inputs in the tool below for your exact number.

How the asphalt calculator works

Tons = Area (m²) × Depth (cm) × 0.023; (Area ft² × in × 0.083 lb→tons)

Asphalt is sold by the ton, and the conversion is one constant: hot mix densities run 2.3 t/m³, so tonnes = area × depth(cm) × 0.023. In imperial the same math gives 0.011 t per ft² at 2 in. Order 5% extra for compaction loss (a 5 cm compacted layer starts as 5.5 cm loose) and lay driveways in 5 cm lifts. Worked example: a 100 m² driveway at 5 cm needs 11.5 t - a single 12 t truck compacting down to about 4.5 cm finished. Residential driveways want 2 layers over 15 cm of base: 4 cm base course plus 3 cm wearing course. The surface is drivable in 24-48 h but full cure takes 6-12 months.

  1. 1

    Measure the space

    Record the area, depth in cm and mix type at the widest and longest points.

  2. 2

    Enter the values

    Type the measurements into the calculator and select your units.

  3. 3

    Apply the formula

    The tool computes Tons = Area (m²) × Depth (cm) × 0.023; (Area ft² × in × 0.083 lb→tons) for your inputs instantly.

  4. 4

    Add waste and order

    Review the total with a 5-10% margin and round up to whole units.

Use Cases

Slab reinforcement

Bar counts, laps and kg totals for asphalt mats.

Steel procurement

Convert asphalt lengths to tonnes for mill orders.

Plumbing rough-ins

Pipe runs and fitting allowances for asphalt layouts.

Common Mistakes

  • Weight from wrong diameter

  • Exceeding conduit fill

  • No lap splice allowance

FAQs

How many tons of asphalt per 100 m²?

At 5 cm: 11.5 t; at 7 cm: 16 t - and +5% for compaction waste on both.

Asphalt thickness for a driveway?

5-7 cm total for cars (4 cm binder + 3 cm surface); 8-10 cm where trucks turn.

How long until you can drive on new asphalt?

Cars after 24-48 h, heavy vehicles after 1-2 weeks; full cure runs 6-12 months - avoid sharp turns early.

Asphalt cost per ton?

$100-200 per ton delivered and paved; a 100 m² driveway at 5 cm totals $1,300-2,400 installed.

Base under asphalt driveways?

15 cm compacted aggregate base on geotextile - asphalt never bridges soft spots, it prints them.