Deck Materials – Full Lumber List

Quick answer

Complete deck material schedule: decking boards, 2×8 joists at 40 cm, doubled rim beams, 6×6 posts, footings, flashing, screws and railing runs.

Figures are estimates from this calculator’s standard formula — adjust the inputs in the tool below for your exact number.

How does the deck materials calculator work?

Joists = W ÷ 0.4 + 1; Beams = Spans + 2; Posts = Beam Ends + Midspans; Rails = Perimeter ÷ post spacing

Instead of working from a supplier's ballpark figure, this calculator derives your deck materials requirement from Joists = W ÷ 0.4 + 1; Beams = Spans + 2; Posts = Beam Ends + Midspans; Rails = Perimeter ÷ post spacing using the exact deck dimensions and height you provide. The arithmetic stays transparent: each result links back to the displayed formula, so you can audit any number. For instance: A 6 × 4 m ground deck: 42 boards (14 × 400), 16 joists of 4 m, one doubled beam, 4 posts and 24 m of railing. Keep in mind: Add 10% to every line - lumber grades cull out the worst 5-8% per delivery. Quantities are rounded conservatively so offcuts, spillage and delivery shortages never stop work mid-job.

  1. 1

    Take dimensions

    Note the deck dimensions and height for the area you are covering or filling.

  2. 2

    Run the calculation

    The calculator applies Joists = W ÷ 0.4 + 1; Beams = Spans + 2; Posts = Beam Ends + Midspans; Rails = Perimeter ÷ post spacing the moment you type.

  3. 3

    Check the breakdown

    Compare base quantity and waste-adjusted totals side by side.

  4. 4

    Plan the purchase

    Use the final figure to price and schedule the delivery.

Use Cases

Lumber takeoffs

Convert plans into deck materials board-foot purchase lists.

Retaining walls

Estimate deck materials courses, drainage and geogrid layers.

Workshop planning

Stage deck materials material drops to match the build calendar.

Common Mistakes

  • Forgetting hardware and fasteners

  • Unequal riser heights

  • Building without permits

FAQs

Joists for a 6 × 4 m deck?

4 ÷ 0.4 + 1 = 11 per 6 m run - 11 pieces of 6 m 2×8 (or 16 at 30 cm centers for composite).

Posts and footings under a raised deck?

A beam every 2.4 m with a 6×6 post each end plus midspan - a 6 × 4 m raised deck takes 4-6 footings of 30 cm × 1 m.

Railing posts and balusters?

Posts every 1.2-1.5 m; balusters at 10 cm max gaps - a 24 m perimeter needs 17 posts and 240 balusters.

Hidden deck fasteners vs screws?

Clips cost 2-3× screws but leave clean faces - about 20 clips per m² of decking.